Energy from Waste Sector Study

September 24, 2014 - This study offers guidance on assessing Energy-from-Waste opportunities under P3 delivery models, and focuses primarily on the Design-Build-Finance-Operate-Maintain (DBFOM) model, which PPP Canada promotes as the model that maximizes risk transfer to the private sector. The conclusions formed in this study should be limited to the Energy-from-Waste sector, and not applied to other assets as certain asset classes may have other unique characteristics to consider when evaluating a P3 option.

Energy from Waste Sector Study